What is the quota for construction waste? Analysis of hot topics and hot content across the entire network
Recently, the issue of construction waste disposal has become a hot topic of social concern. Especially in the context of "double carbon" goals and urban renewal, how to regulate the removal, disposal and quota application of construction waste has triggered extensive discussions. This article will combine the hot topics on the Internet in the past 10 days, conduct a structured analysis of the key issues in the application of construction waste quotas, and provide practical data reference.
After combing through social platforms, industry forums and policy dynamics, the following topics are relatively popular:

| topic | heat index | Main points of dispute |
|---|---|---|
| Construction waste classification standards are not uniform | 85% | Are the quotas in different places compatible? |
| Renovation waste removal costs skyrocket | 78% | Is the quota application reasonable? |
| Renewable resource utilization subsidy policy | 72% | Does the quota include recovery costs? |
According to the "Construction Engineering Bill of Quantities Pricing Specifications" (GB50500-2013) and local documents, construction waste quotas need to be divided into the following types:
| Garbage type | Quota number | unit of account |
|---|---|---|
| Demolition waste (concrete) | AZ-001 | Yuan/ton |
| Decoration waste (mixed category) | AZ-005 | Yuan/cubic meter |
| muck | AZ-008 | yuan/train |
Note:The actual application needs to be combined with the "Construction Project Consumption Quota" in the location of the project. For example, Beijing uses the "Housing Repair Quota (2021 Edition)" to list decoration waste separately.
In response to the issue of "excessive cost of decoration waste removal" that is hotly discussed by netizens, the root cause is:
Suggestions:Prioritize inquiries issued by local housing and construction departmentsSupplementary quota documents, for example, Shanghai will add “Special Cleanup Quota for Decoration and Renovation Waste (SH-2023-06)” in 2023.
According to the latest developments from the Ministry of Ecology and Environment, construction waste quotas will gradually be included inCarbon emission reduction indicators, for example:
| policy direction | Affect quota | Implementation time |
|---|---|---|
| Waste resource utilization rate ≥30% | The quota is reduced by 5%-10% | Pilot in 2024 |
| Illegal dumping blacklist | 20% increase in quota | Fully implemented in 2025 |
Summary:Construction waste quotas need to be dynamically adjusted according to project types, regional policies and environmental protection requirements. It is recommended that practitioners regularly pay attention to the regulations jointly issued by the local Housing and Urban-Rural Development Bureau and the environmental protection department.Supplementary instructions for quota.
check the details
check the details